Questions
- Question 5
A water tank has a leakage. Each week, the tank loses 5 gallons of water due to the leakage. Initially, the tank is full and contains 2000 gallons.
- Question 6
A drug company has manufactured 7 million doses of a vaccine to date. They promise additional production at a rate of 1.4 million doses/month over the next year.
(i)How many doses of the vaccine, in total, will have been produced after a year?
(ii)The general term describes the total number of doses of the vaccine produced. Describe the meaning of the variable in the context of this problem. Find the general term .
(iii)Find the value of and interpret its meaning in words.
- Question 7
At a toll booth, the number of vehicles passing through during the first minute is 100. Due to road congestion, each minute only 80% of the vehicles from the previous minute manage to pass.
- Question 10
Two cars start together in the same direction from the same place. The first goes with uniform speed of 20 km/h. The second goes at a speed of 12 km/h in the first hour and increases the speed by 1 km/h each succeeding hour. After how many hours will the second car overtake the first car if both cars go non-stop?